TLDR:
Can I add a window at below ground level and dig out front yard a bit without planning?
Can I add a staircase to the basement, below ground level in the backyard without planning?
Can I deduct from taxes building material bought in France, what is the limit tax wise passing the border with building goodswithout paying the Swiss border VAT?
____________________
Bought a 1970s built house, and I want to do all sorts of work. It's got a basement + ground floor. Questions I have are mainly regarding the basement for this thread.
I was going to start with the inside of the house and only go to planning once I'll have done the stuff I can do without permission. I located a few asbestos pipes so will be removing them myself to avoid a costly bill (yes it's dangerous etc...)
Question I have: the old room for the fuel tanker does not have a window - can I put in a window at below ground level and dig a bit my front garden to give some natural light to the room without planning?
This is more unlikely: In the backyard, I want to dig in some stairs to the basement - can that be done without planning? Again below ground level.
In terms of how much I can extend my house, there is a veranda covering an area of 20sqm, I want to replace this with a heated conservatory, essentially adding to the square footage of the house. What is the rule of thumb in planning here as to what they will let me do? I was told that adding a floor is not just impossible, it's beyond the realm of possibilities given all the villas in my neighbourhood were built at the same time and have the same height. The ground floor area is 140sqm on a 500sqm parcel, with equal amount of space in the basement (got a great ceiling height of 2200 so will dig out 60mm in the basement and put wet underfloor heating) - I assume I don't need permission to dig out my basement and put underfloor heating (I have a heat pump so this would be the optimal option).
This is for Geneva specifically, as I understand all planning rights are given at the canton level. I'll also add a pool, but some neighbors have it already and I was told that this should not be an issue (this will be added at the same time as the conservatory and my brother owes me some manual labor to help dig).
I want to do all the planning application at once, once I'll have done the works inside, including underfloor heating. Thus the question regarding whether I am allowed to do some openings without planning. The work will be done by me, so this will likely go on for the next 3 years before I get to planning Also I want to draw the plans and submit myself, anyone done that, or do you always use an architect as lubricant with the authorities?
I have started to use Hornback delivery - they are amazing, and any immediate need I go to Leroy Merlin in France. Great combo - in terms of taxes, anyone experienced in knocking down material costs bought in France from their taxes? Or does it have to all be Swiss Hornback if I want a chance to get cash back at the end of the tax year?
I am a small time tiny real estate developer in the UK, thus have experience in London in building - also after London prices I cannot bring myself to pay for manual labour here, thus the DIY (we did a house when I was a kid in the US, that was basically the exact same footprint as the house I bought here in Geneva so very excited about showing my daughters how to do manual labour)